Home > Current Activities > Reference Documents > ProSource_Geological_AssessmentNews  |  Search  |  Print View   

Geological Assessment

Geological Assessment, UMore Park, Rosemount and Empire Township, Minnesota. ProSource Technologies, Inc. 2008.

Introduction, Geological Assessment and Certification (3.1 MB PDF)

Tables
Table 1 Phase I Auger Borings (83 KB PDF)
Table 2 Phase II Auger Borings (36 KB PDF)
Table 3 Phase II Rotasonic Borings (35 KB PDF)

Figures
Figure 1 Site Location Map (128 KB PDF)
Figure 2 Test Hole Gride & Numbering System (228 KB PDF)
Figure 3 Grain Size Classification System (160 KB PDF)

Plates
Plate 1 Test holes drilled September 17, 2007 to April 23, 2008 (571 KB PDF)
Plate 2 Overburden thickness (125 KB PDF)
Plate 3 Total thickness of economic sand and gravel (59 KB PDF)
Plate 4 Weighted average percent gravel (64 KB PDF)
Plate 5 Material at bottom of deposit (83 KB PDF)
Plate 6 Elevation of bottom of deposit (685 KB PDF)
Plate 7 Overburden volume estimate (56 KB PDF)
Plate 8 Sand and gravel volume estimate (57 KB PDF)

Appendices
Appendix B Explanation of Project Database (324 KB PDF)
Appendix C Project Team Resumes (69 KB PDF)
Appendix D Electronic Data
Appendix E Drilling Logs
Appendix F Laboratory Testing Data - Gradations